“The CPE piling hammer gives us greater flexibility and saves us time during piling operations. This means we can achieve higher productivity.” So says Richard van den Berg, owner of Aannemingsbedrijf van den Berg in Westknollendam. INPIEQ, a specialist in foundation equipment and associated materials, has developed a compact, high-speed hammer specifically for piling on construction sites where space and headroom are limited.

INPIEQ has specially adapted the piling hammer for Aannemingsbedrijf van den Berg so it can be suspended between the leaders on the crane. INPIEQ director Frank van Deursen explains: “We customised our CPE piling hammer so it fits neatly between the leaders. The hydraulic hoses run along the boom. Using the hammer in this configuration makes it easy to carry out piling work in deep, narrow trenches.”

Using the hammer in this configuration makes it easy to carry out piling work in deep, narrow trenches.

The only one in the Netherlands

For now, Aannemingsbedrijf van den Berg is the only company in the Netherlands using INPIEQ’s CPE piling hammer in this way. Richard says: “We’re very pleased with this solution. Because the piling hammer is not suspended from a leader, but can be positioned ‘between the leaders’ on the crane, we can move it easily and quickly using the crane. This means we don’t have to drive back and forth, which saves us a lot of time.”

For now, Aannemingsbedrijf van den Berg is the only company in the Netherlands using INPIEQ’s CPE piling hammer in this way.

A bespoke solution

Richard says: “INPIEQ is a great partner that really thinks things through with us and looks ahead. They’ve supplied us with a fantastic bespoke solution.” Frank agrees: “We always consider the client’s wishes and needs when addressing a challenge, and this almost always calls for a bespoke solution.”

CPE piling hammer

Frank says: “Our CPE piling hammer can easily be fitted to various machines. As well as piling and drilling rigs, it can also be mounted on an excavator. The hammer is suitable for concrete and timber piles, as well as steel tubes and sections. It is also easy to operate and maintain.”   

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectBouwMat
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.