De Waalpaal takes delivery of VDH Mini piling rig

Lead
De Waalpaal ordered the MPR-2000 to replace an existing piling rig. Throughout the development process, VDH and De Waalpaal worked closely together to ensure the machine met De Waalpaal’s exact requirements. Quality, safety and ease of use were central to the design process.
Naturally, the MPR-2000 also had to be a modern machine. The result is a rig whose piling process is closely monitored by multiple sensors. As well as achieving a high number of blows per minute, operators can use the touchscreen to view potential faults, making them easy to resolve. The sensors also ensure that potential faults do not lead to dangerous situations, as the piling process is automatically stopped in the event of a fault. Modern technology has resulted in a machine that is easy to operate and ensures safety at all times. Both the MPR-2000’s software and free-fall winch were developed in-house by VDH.
About the customer
De Waalpaal was founded in 1911. At the time, the company wanted to extract water from deeper sand layers. Since iron pipes were expensive, the idea was to stack concrete pipes with a steel inner tube. To drive the pipes down, complete steel beam frames were built and loaded with concrete or iron ballast. Using pulleys and steel cables, the pile was effectively pulled into the ground. It was soon realised that the pipe, once filled with concrete, could also be used as a load-bearing pile. This marked the start of De Waalpaal as a foundation contractor. Since 2003, De Waalpaal has been part of the Van ’t Hek group.
De Waalpaal is often at the forefront of developing new techniques and complex foundation solutions. As a partner, De Waalpaal can manage the entire foundation process, including ground investigations, cone penetration tests and foundation advice.
Question about this story? Ask your question