A flexible system solution delivers

The N200 crosses the Boezembrug through Halfweg and is an important link between Haarlem and Amsterdam. However, the bridge no longer meets modern requirements. Commissioned by Waterschap Amstel Gooi en Vecht, Gemeente Amsterdam, RWS and Waternet, construction consortium ééN200 is working on the Boezembrug, which will keep the region accessible and improve quality of life in Halfweg.
during the renovation of the Boezembrug in Halfweg
Cees Abma, site manager at construction consortium ééN200: “To create a safe working area for the people working on the Boezembrug deck, we chose PERI’s systems and services. PERI’s VARIOKIT system provided the solution for constructing the structure along the edge of the Boezembrug deck. We also know that PERI produces well-considered, engineered designs that do the job.”
A feat of engineering
“When dimensional accuracy and peace of mind, speed and safety are key requirements, PERI is the partner for the job,” says Wout van de Weijer, design engineer at PERI. “The Boezembrug’s unusual shape in particular called for a feat of engineering and close cooperation between all parties.” The structure consists of standard VARIOKIT components, preceded by a bespoke design.

A suitable solution for supporting the concrete deck edge, despite the limited height of the precast beams and the location above the water.
System flexibility
“The flexibility of the VARIOKIT system made it possible to create a suitable and safe structure,” continues Van de Weijer. “By using straight beams in various sizes, we created a curve for the bend in the bridge. The main challenges were the limited height of the precast beams, working just above the water, a sheet-pile wall that was ‘in the way’, the bridge’s inner curve, and the fact that the structure would need to be removed quickly and easily once the new deck had cured.” Abma adds: “PERI carried out the calculations, provided advice and ultimately produced a suitable design in 2D and 3D. They took care of everything for us.”
No challenge too great
PERI supplied the system in elements, as complete as possible, including a lifting and assembly plan, making it quick to assemble and easy to dismantle again later. No challenge is too great, either for PERI or for the VARIOKIT system. Abma: “PERI really takes the whole picture into account, allowing us to quickly and efficiently put up a structure that enables work on the Boezembrug deck to be carried out safely!”