Rombouts Kunststof Techniek (RKT), based in Tholen, has been an innovator in plastics processing for 36 years, providing tailored solutions for a wide range of situations. The company is increasingly focused on ‘working smarter’ by prefabricating as much as possible under controlled conditions in its own ‘prefab shop’. This safeguards quality and shortens lead times. 

“In our well-equipped workshop in Tholen, we prepare as much of the work as possible, so that on site all that remains is assembly,” says Marcel van Pagee, director of RKT. “We essentially create a kit, with the maximum dimensions permitted for road transport as the only limitation: components up to 3.5 metres wide and 20 metres long. Ultimately, this results in higher quality and a lower price.”

De Pals and Zoute Sluis pumping stations

RKT can work with both thermosetting plastics and thermoplastics in its prefab shop. The prefab shops for thermoplastics and thermosetting plastics are equipped with a very extensive range of machinery and equipment. “These machines enable us, for example, to produce specific segmented bends with great precision. This is also possible on site, but takes much longer. And it is much harder to achieve the same high level of quality,” Van Pagee emphasises. “For example, we made a major contribution to making the De Pals pumping station near Halsteren and the Zoute Sluis pumping station near Nieuw Vossemeer, both operated by Waterschap Brabantse Delta, fish-friendly. The GRVE DN 800 and DN 600 pipework was fully prepared in our prefab shop, so installation on site took only a limited amount of time.”

The GRVE DN 800 and DN 600 pipework for the fish passage at De Pals pumping station was fully prefabricated, significantly reducing installation time on site.

Prefabricating PP tanks

“Last year, we built six PP tanks for a valued client,” Van Pagee continues. “As the tanks were to be installed elsewhere in the building, the associated pipework also had to be replaced. It was a very unusual project that gave us plenty of scope to put our creative thinking to work. This was especially true because the available space for four of the tanks was relatively small, and the entrance to this area was only 2.2 metres wide, meaning the tanks could not be transported through the building in one piece. We ultimately prepared them in sections, transported them and assembled them on site.”

Welding containers

Another example of working smarter is RKT’s contribution to the seawater thermal energy storage system at Duindorp. “Here too, space was very limited for installing all the pipes, most of them underwater. By preparing all the pipe sections as a ready-to-install package, we significantly reduced the time needed for installation on the quay and underwater. We would have taken at least twice as long doing the work on site.” Van Pagee acknowledges that not everything can be prefabricated. “That is why we have several welding containers for on-site welding, allowing us to control the conditions in the field and achieve the best possible joint. We consider that part of working smarter too. And we strive to stand out in every area.”     

Een zakelijke vraag aan Rombouts Kunststof Techniek B.V.? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectYearbook
  • CompanyRombouts Kunststof Techniek B.V.
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.