For several months, QUALM has been renewing and extending a firewater system for a gas terminal in the Port of Antwerp. It is an ideal job for the specialist in fire protection systems, pipework and earthworks, which is carrying out the entire project in-house, from A to Z, with its own certified employees. 

Gas is handled and transhipped on a large scale at the terminal. “Safety is the top priority there,” says Menno Mulders, director of QUALM. “That is why part of the existing firewater system is now being renewed and modified. Our task is to install the new GRE pipework underground without disrupting the client’s operations. Work at the gas terminal is continuing unabated. With all the bends, tees, siphons and other fittings, it is quite a puzzle. The new pipework runs in every direction across the site and contains very few straight sections.”

Branch connection on GRE pipework for tank fire protection system.

Spool fabrication drawings

QUALM is the main contractor for this project and subcontracts only the earthworks to a contractor based on site. “They know the site and the end client well,” says Menno. “After surveying the trenches using GPS, we produce what are known as spool fabrication drawings for the pipework. These show exactly how the pipe is to be assembled underground and where a bend, a tee for a hydrant or another fitting should be positioned. As much of the pipework as possible is prefabricated under controlled conditions in our workshop in Rozenburg. It is then sent to Antwerp in full truckloads for installation underground. In this way, the existing firewater system is gradually extended as required. We are on schedule to complete the project by the end of 2023, and in early 2024 we will replace a few existing sections of the fire main.”

Long service life 

For this firewater system, QUALM is using glass-reinforced epoxy (GRE) pipe in diameters ranging from 200 to 500 mm. “The system is chemically resistant and has been tested for a service life of 50 years, but in practice it lasts much longer. It just keeps going,” Menno assures us. He knows what he is talking about: QUALM has extensive experience with projects of this kind. “To ensure quality, we work exclusively with our own certified staff, who work well together. We also prefabricate as much of the pipework as possible in our workshop, where every adhesive joint is made under ideal conditions and its parameters are recorded in detail. On site, we make only mechanical connections using a Rubber Seal Lock Joint. This also shortens the time required on site.” 

A business enquiry for QUALM? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectYearbook
  • CompanyQUALM
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.