A new cycle parking facility for 4,000 bicycles is being built underwater in the IJ. Above it, the IJboulevard will provide a 6,000-square-metre public space for people to spend time. Lommers Welding Services is delivering a large number of anchoring and support structures for contractor Van Hattum en Blankevoort in accordance with NEN-EN 1090. The welding company uses a unique approach: thanks to its in-house collaboration with engineering consultancy Kok & van den Heuvel, the structures’ buildability is assessed during the design phase.
One of the City of Amsterdam’s key ambitions is to create more space for pedestrians. As pavements serve multiple purposes and the city grows busier, space for pedestrians cannot be taken for granted in the capital. The underground cycle parking facility has therefore been designed as an extension of the public realm. Extra-wide stairwells with large glazed areas offer views from the boulevard into the bright, welcoming facility. Its spacious, column-free layout, combined with generous daylight, good visibility and the central position of the attendant, gives visitors a sense of security at any time of day.

Integrated design input
Van Hattum en Blankevoort brought Lommers Welding Services on board at an early stage to provide input on, among other things, the anchoring structure, stair elements and movement joints. “Because we work very closely with engineering consultancy Kok & van den Heuvel, we can eliminate problems that often arise between preparation and execution at an early stage,” says Gerda Lommers of Lommers Welding Services. “We work with our clients to take an integrated approach, so that together we can arrive at a robust design with fewer changes during execution. Buildability and safety are assessed several times throughout the process. We continue to develop and focus on high quality, safety and the latest standards, while putting our family atmosphere first.”

Smart construction methods
“We work on many projects where an execution class under NEN-EN 1090, from execution class 1 to 4, and/or the ROK applies,” Lommers Welding continues. “Our in-house collaboration with engineering consultancy Kok & van den Heuvel often enables us to nip potential failures in the bud and devise ‘smart’ construction methods. That is truly unique for a welding company. For example, we modified the initial detail design for the cycle parking facility’s anchoring structure in the IJ, which we are producing under CE marking at our workshop in Purmerend, to ensure better quality control throughout the process. These structures will be installed 5 metres below the surface of the water in the IJ. The three-way partnership between Lommers Welding, engineering consultancy Kok & van den Heuvel and MABA Waterland means we can fully support clients with an integrated, buildable solution.”