A project or asset in the water and infrastructure sector passes through a number of stages in its lifecycle, from design to demolition. Safety is far from always top of mind at every stage. A missed opportunity, according to the safety experts at INNOCY. By considering safety at an early stage, you can avoid having to apply sticking plasters during construction or maintenance.

The widening of the A20 is a good example of a project where safety is top of mind. “INNOCY joined the project during the design phase,” says Midas Luijer, safety expert at INNOCY. “Our role is to bring a safety perspective to the design decisions and consider their impact on later stages. We also ask whether the chosen design can be maintained safely, and whether it is safe for road users and the surrounding area. The earlier you start thinking about safety, the greater the impact you can make. We are also on site during construction, boots on the ground, checking that occupational and construction safety arrangements are in place and that the agreed safety measures are being followed.” 

INNOCY can provide safety expertise at every stage of an asset or project.

Labour inspectorate

Another area where INNOCY’s safety expertise is put to use is flood protection. “As part of the dike reinforcement programme, we advise water authorities on how best to meet their statutory responsibilities,” Midas explains. “The Working Conditions Act sets out very clearly what clients need to put in place. This includes the health and safety plan, covering all the project’s safety risks, as well as the BTO decisions you make (building, technical and organisational decisions, ed.) and must justify if they affect safety and health. If an incident occurs and you have not properly justified a particular design decision, this is considered a shortcoming and the Netherlands Labour Authority can reprimand you as the client. We look at what is required, while also working to strengthen the safety culture in project teams. We pay close attention to warning signs and are not afraid to ask questions.”

Maintenance phase

As mentioned, INNOCY can provide safety expertise at every stage of an asset or project, and is a regular presence at the Maeslant Barrier. “The storm surge barrier was built some time ago, of course, but it still needs to be maintained properly and safely,” says Oscar Ewaart, safety expert at INNOCY. “A regular maintenance contractor has been appointed for a set period to carry out all routine maintenance and inspections. We drew up the health and safety plan on behalf of the client. It sets out risks and hazards, measures, responsibilities, coordination and consultation, emergency procedures, and supervision and monitoring, all to safeguard the health and safety of employees and third parties involved in a project. Oscar also carries out safety observations on behalf of the client, to check that the arrangements set out in the plan are being followed. If they are not, we speak to the employee, document the issue in a report and start an improvement process together with the contractor.”

Integrated safety

INNOCY often takes on the role of integrated safety expert on projects. “We look at integrated safety on infrastructure projects, on the water and on the railways,” says Midas. “That means not only considering safety during planning and construction, but also contributing to contract requirements, drawing up control measures and ensuring the safety of the immediate surroundings.” Oscar adds: “On completion, we also make sure there is an up-to-date health and safety file. You can think of it as a memory aid for an asset, listing safety provisions that affect safe working practices and clearly identifying residual risks so they can be taken into account during future maintenance work.”     

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectDigitalisation & software
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.