The key design considerations for making level crossings safer
Text and images Iv-Infra

There are several level crossings in the Netherlands that pose a risk to low-loaders. A low-loader could become stuck when crossing one of these raised crossings, creating a life-threatening situation.
The crossings are listed in publicly accessible databases, such as the RDW digital road map and ProRail’s low-loader guide. These databases help transport operators check in advance that their vehicles will not become stuck. The guiding principle is that a level crossing must be traversed within 15 seconds. If it is estimated that this will take longer, ProRail must be contacted.
One of these crossings is on Stationsweg in Lisse. Agricultural vehicles using this crossing currently scrape the crest.

Scope of the assignment
ProRail asked Iv-Infra to develop concept designs for various alternative road and/or rail alignments to eliminate the risk to low-loaders. The level crossing on Stationsweg crosses two tracks on a curve. The cant in the track results in an unfavourable longitudinal road profile. Because the road and track lie in the same plane, a ‘ramp’ forms at the crossing. At the crest of the ramp, agricultural vehicles scrape the road, risking becoming stuck.

3D laser scanning
To identify the best option, the precise positions of the road and railway must be surveyed. This is done using 3D laser scanning, combined with total station surveying and GNSS (satellite navigation).
For the 3D laser scan, separate scans are taken at several locations. Each scan captures the surroundings and several targets. A total station is also used to accurately register the individual 3D scans against one another (± 3 mm). The result is a complete 3D point cloud of the surroundings. In addition, GNSS is used to survey distinctive points that are also visible in the 3D scan. This makes it possible to define the 3D point cloud in RD coordinates.
The advantage of 3D laser scanning using this method is that objects in the area can be surveyed without contact, in a relatively short time and at a very high point density, without accessing the track. No track possession needs to be requested.
The 3D point cloud provides the basis for further processing and design development.
Design process
To determine whether a level crossing poses a risk to low-loaders, the so-called hazard class is calculated. The calculation is based on an axle spacing. The vertical clearance (arrow) is determined from the survey of the road and track. The hazard class is then calculated using the formula.
Level crossings with a k-value ≤ 100 may pose a risk of vehicles becoming stuck. Experience shows that a crest curve longer than 200 metres does not cause a problem. The aim when preparing the concept design is to achieve a k-value greater than 100 after surveying.
There are several options for developing the designs. The risk to low-loaders can be eliminated by adjusting the tracks, the road or both. If the track is modified, it may be necessary to increase the curve radius. This reduces the cant and results in smaller differences in height.
Another option is to create a more gradual road profile leading up to the ramp at the crossing.
A hybrid solution is also possible. For example, the tracks could be lowered along their entire length, creating room in the road profile for more gradual transitions to the crossing.

Managing interfaces
The designs must also take account of potential interfaces. In the case of the level crossing in Lisse, these include existing cables and pipes, drainage and maintaining level crossing safety. Recurring problems with the track alignment have been identified at the crossing on Stationsweg: so-called voiding beneath sleepers (slapping sleepers). Voiding occurs when there is a gap between the underside of the sleeper and the ballast in the unloaded state. When the track is loaded, the sleeper deflects. More severe cases of voiding are known as slapping sleepers.
There are various causes of voiding. It is suspected that slapping sleepers keep recurring at this location because the ground is saturated with rainwater. In light of this, it is important to ensure that the concept designs do not create a situation that worsens drainage. Additional drainage measures can always be considered at a later stage.
As a first step, cables and pipes must always be identified through a KLIC notification, so that any restrictions can be taken into account during the assessment. Depending on the findings, the concept designs must account for any interfaces that limit the options for modifying the road and/or track. We will also assess any potential negative impact on level crossing safety in the new situation. If such impacts cannot be avoided, we will propose additional measures.
In short, several aspects of level crossing safety need to be considered during the design phase. In the coming period, Iv-Infra will start mapping the situation at the crossing in Lisse and develop a balanced recommendation that improves level crossing safety, assessing the impact on road traffic, rail traffic and the surrounding area, as well as the costs.