In our previous edition, we wrote about the importance of a baseline survey. Arthur Maassen, owner of Maatvoeren en Landmeten B.V. (M&L), shared his perspective. In a nutshell: a baseline survey, provided it is carried out accurately with the right equipment, prevents rework, failure costs and adjustments during construction. This article looks at cadastral maps, property boundaries and the importance of checking. Maassen says: “If you skip that check by not carrying out a baseline survey, you risk scenes straight out of Rijdende Rechter.”
Cadastral maps
The oldest Dutch cadastral maps date from 1812 to 1832. Boundary surveys were plotted on cadastral supplementary sheets for each cadastral municipality, section and sheet number. The Kadaster carried out its first tentative digital surveys as early as 1976, but these were still recorded manually on the supplementary sheets. Around the 1990s, those cadastral supplementary sheets were traced to create digital maps. Most cadastral boundaries therefore have their origins in digitisation, but even modern surveys are sometimes not shown exactly on the map: a 1 mm discrepancy on a map at a scale of 1:1000 represents 1 metre on the ground. “So don’t get into an argument with your neighbours on the basis of a digitised cadastral map,” says Maassen. “Yet things often go wrong, including when professional parties really ought to know better. A poor choice driven by time or profit? If in doubt, there is only one Kadaster! Don’t Google it, go straight to www.kadaster.nl, because only the cadastral field survey shows the actual position of the cadastral boundary.”

Property boundaries under the microscope
“As well as ongoing changes in spatial development, people’s priorities have also changed,” Maassen observes. “Property boundaries have been under the microscope for some time now. Ever since ‘De Rijdende Rechter’ first aired, the terms ‘boundary dispute’ and ‘prescription’ have come up at practically every birthday party.” Maassen, who has carried out surveys for the courts several times in recent years, says that what you see on meester Visser’s programme is unfortunately a common occurrence. He again stresses that only cadastral fieldwork provides genuine, reliable information. “The Kadaster, or a really good surveyor, does not set out the legal cadastral boundary, but the boundary as it was originally intended. When a dispute has arisen, a judge looks at what the Kadaster has set out and then decides the legal position on that boundary. Various factors are taken into account, including prescription. In principle, once the judge has ruled, the clock on prescription starts all over again.”
Always carry out a baseline survey!
“For project development, I therefore recommend taking a very close look at both the physical property boundaries and the cadastral boundaries in advance, but making sure that the cadastral boundaries are reconstructed following a baseline survey. The survey method and equipment are crucial to carrying out a good baseline survey. I personally like working with Topcon equipment: it is modern, accurate and user-friendly. It is important to use equipment for the purpose it was designed for.” Maassen concludes: “Checking is everything for a surveyor. By identifying problem areas early, you can anticipate deviations and adapt the design accordingly. That way, you work accurately, avoid failure costs and safeguard quality.”
Want to know more about using baseline surveys in your own projects? Download the practical white paper!
Een zakelijke vraag aan Topcon Positioning Netherlands? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- SubjectDigitalisation & software
- CompanyTopcon Positioning Netherlands