News

With 1 million cyclists, PlasticRoad is ready for market launch

With 1 million cyclists, PlasticRoad is ready for market launch

The millionth cyclist was recorded yesterday on the world’s first PlasticRoad in Zwolle. The first road made from recycled plastic was a world first in 2018. After more than 1.5 years of testing, learning and development into an industrial design, PlasticRoad is now ready for market launch. Industrial production of PlasticRoad will begin in the first quarter of 2021. The results of the two cycle path pilots in Zwolle and Giethoorn have been so positive that this major next step is now possible. PlasticRoad can withstand heavy loads, offers a solution to water management challenges during heavy rainfall and drought, and performs well in all conditions.

The initiators of PlasticRoad are extremely pleased with the pilot results and are looking forward to the first PlasticRoad element rolling off the production line. Marcel Jager and Anne Koudstaal of the PlasticRoad team explain: “Together with our clients, we have shown that our groundbreaking circular concept, a prefabricated road made from recycled plastic with rainwater storage, is feasible. What began in 2018 with two pilots is already ready for industrial production, and we are incredibly proud of that.”

A circular cycle path

The two 30-metre cycle path pilots demonstrate that a road made from recycled plastic is feasible. Each pilot contains around 1,000 kilos of recycled plastic, equivalent to 218,000 plastic cups. This pilot version of PlasticRoad has already saved around 50 to 70% in CO₂ emissions compared with a traditional cycle path made of asphalt or concrete paving slabs. This percentage will increase when the final design goes into industrial production next year. The circularity of the final product has also been optimised through further development of the structure, as confirmed by an independent circularity audit.

Strong and robust

When they were installed, both pilots in Zwolle and Giethoorn were fitted with sensors to measure use and how the product ‘behaves’ 24/7. The key finding from the cycle path pilots is that PlasticRoad can also withstand heavy traffic. Field tests and data show that PlasticRoad performs very well under heavy vehicles such as refuse collection lorries and maintenance vehicles. Further product improvements mean that the final version will be more robust and 2.5 times as strong as the version installed in Zwolle and Giethoorn. This makes PlasticRoad suitable for use in car parks, and the team is working towards the first pilot for this application. It also makes a road for motor traffic made from PlasticRoad an increasingly realistic prospect.

Climate-adaptive infrastructure

Climate change is causing extreme rainfall and heavy downpours to occur more frequently. Existing infrastructure often cannot cope, resulting in flooded streets. The hollow space in PlasticRoad is designed to collect this water quickly and then allow it to infiltrate gradually into the ground. In practice, this climate-adaptive solution has proved highly effective. Both pilot locations previously experienced water management problems. Even during the heaviest downpours, the impact on storage capacity was minimal. The highest water level measured in PlasticRoad was just 48% of the available storage capacity at the Zwolle site. The water then infiltrates gradually into the ground over two days, exactly as expected.

The Province of Overijssel and the Municipality of Zwolle were PlasticRoad’s ‘launching customers’. Together, they initiated the two PlasticRoad cycle path pilots. The data are positive, and users of the cycle paths are enthusiastic too. “Sustainable infrastructure for our residents and smart use of space are what matter to us. To make progress, you have to stick your neck out and be willing to innovate. It is great to work together on this as a municipality and province, alongside innovative companies from the region,” said Bert Boerman, member of the provincial executive (Province of Overijssel), and William Dogger, alderman (Municipality of Zwolle).

Next steps

Following the convincing results of the pilots, work is now under way to get the production line up and running. PlasticRoad can now be ordered and will be available from the first quarter of 2021. There has already been considerable interest from the market. Together with clients and contractors, PlasticRoad aims to make cities climate-adaptive and CO₂-neutral through a range of applications. Cycle paths, car parks, pavements and school playgrounds are among those planned. The initial focus is on sales in the Netherlands and neighbouring countries, with expansion into other markets around the world expected thereafter.

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectNews
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.