Apeldoornseweg: from waste plan to materials plan

How can we maximise sustainability within existing contracts? That was the question facing the municipality of Arnhem when it tackled Apeldoornseweg. “Rather than opting for innovative materials whose value and quality have yet to be proven, we looked at what was possible within the existing RW contracts,” says project manager Sil Polman. “There turned out to be more options than we initially thought.” Concrete paving slabs and kerbs, concrete sewer pipes and asphalt were among the materials reused.
Apeldoornseweg is an important access road into the city and connects to the A12. Its redesign was no small undertaking. “The sewer was in poor condition, as was the asphalt. The bus stops were outdated and the traffic lights needed replacing. We also wanted to put an end to flooding. Apeldoornseweg has a change in elevation, so water runs downhill from the adjacent park. We also took the desire for more green space in the city into account. And we listened to local residents: they wanted more crossing points and traffic-calming measures.”

With all these challenges, the project was already a demanding one. But the team wanted to go a step further on sustainability. Not by serving as a test bed for innovative materials, but by using products that meet existing requirements. “We set a number of sustainability requirements that contractors had to meet. One example was a minimum requirement for the use of secondary aggregate in new concrete products. You can crush material into rubble and use it as a road sub-base. But you can also crush old products into aggregate for new products, or remove products from one location and reuse them elsewhere in their original form.”
Arnhem focused on the latter two forms of reuse. “Not all the sewer pipes and paving slabs could be reused. These were crushed into aggregate in two sizes. The coarser fraction was used in new slabs and kerbs; the finer fraction was used in the bedding mortar for the concrete walls installed behind the kerbs as part of the project.”
The new concrete kerbs and paving slabs contain 25 per cent secondary aggregate. “As the project progressed, we also set a similar requirement for the sewer pipes. In this case, the figure was 15 per cent.” By asking contractors to draw up a materials plan, the municipality kept the dialogue with the parties going. “Because we kept an open mind, we identified opportunities along the way to make the project even more sustainable.”
Sustainability was important to this project, as was proven quality. “Thanks to the assessment guideline ‘Environmental profiles for concrete infrastructure products’, you can be sure that the required percentage of secondary materials is achieved and that the finished product is of good quality.” More information about the assessment guideline is available at Betonhuis.nl/bestrating/brl.
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- ThemeMaterials and techniques for infrastructure
- SubjectNews