News

A preferred supplier to the civil engineering sector

Al vele tientallen jaren is Bunnik Verhuur en Grondverzet preferred supplier voor diverse aannemers in de grond-, weg- en waterbouw.
Al vele tientallen jaren is Bunnik Verhuur en Grondverzet preferred supplier voor diverse aannemers in de grond-, weg- en waterbouw.

For many decades, Bunnik Verhuur en Grondverzet has been a preferred supplier to various civil engineering contractors. The company has been a familiar presence on the Blankenburg Connection and at the Maasvlakte for many years. It is also making substantial investments in further improving the sustainability of its machinery and pumps, and the family-run business has achieved the first level of the Safety Culture Ladder.

Bunnik Verhuur en Grondverzet is a familiar presence on the Blankenburg Connection.

Sustainability

Bunnik Verhuur en Grondverzet is stepping up efforts to make its machinery fleet more sustainable. “We’re busy electrifying our compact equipment,” says business manager Perry Bunnik. “We always have an electric alternative available for every type of machine. That includes an electric plate compactor, shovel, compact excavator and so on. We’re also proud that 90% of our wellpoint dewatering and wastewater pumps run on efficient Stage V engines, and that our company achieved the first level of the Safety Culture Ladder last year.” Perry has also noticed an increase in demand for trench shoring. This has prompted the company to expand its range. “It has everything to do with the stricter regulations, under which a trench deeper than 1.20 metres is considered a confined space,” Perry explains. “In that case, safety measures must be taken to prevent collapse. We hire out trench shoring in all shapes and sizes.”

In the excavation pit

Bunnik Verhuur en Grondverzet is a familiar presence on the Blankenburg Connection. “Last year, we mainly supported the BAAK construction consortium during numerous weekend working periods, 14 weekends in total. We’ve recently moved into a new phase here. To make room for the tunnel construction, part of the Boulevard in Rozenburg was excavated,” Perry explains. “Now that the tunnel roof is complete, work has started on rebuilding the Boulevard. First, the soil excavated during the tunnel works is being put back. To get our machines into the excavation pit, two crawler cranes and a 13-tonne vibratory roller, they were lowered in with a 200-tonne mobile crane. By lowering backfill material into the pit, the machines are working their way back up. The job involves around 90,000 cubic metres of material.”

Bunnik Verhuur en Grondverzet’s machines are lowered into the excavation pit with a 200-tonne mobile crane.

“We at Bunnik Verhuur en Grondverzet are proud to be part of such a special project as the Blankenburg Connection,” says Perry. “Everything has gone smoothly so far, thanks to the efforts of our motivated skilled workforce. They’re people we value highly, and they’re also regularly working at the Maasvlakte and on many other projects, carrying out a wide range of tasks.”   

A business enquiry for Bunnik Verhuur? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectNews
  • CompanyBunnik Verhuur
  • CompanyGrondverzet Richard Palmen
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.