Sewer built using a double-wall pipe system

The Great Brombachsee lies around 40 km south of Nuremberg. The lake was opened in 2000 and is home to one of Germany’s largest dams, both in terms of surface area and storage capacity. In response to the growing number of tourists, 20 floating houses were built on the shores of the lake in February 2018. Alongside a range of other amenities, each house has a well-designed sanitary installation. The sewer pipes were welded using the double-wall AGRU Poly-Flo pipe system, made from PE 100-RC.
The wastewater is safely conveyed through a pressure sewer in Brombachsee to a collection tank on the mainland. From there, the collected wastewater is sent on to the wastewater treatment plant. Special precautions must be taken when installing and operating sewers in catchment areas such as Brombachsee. In this zone, pressure pipes with a very high risk potential must have double walls. Another challenge in planning and carrying out the project was the variation in water levels. This is because the pipes connected to the pontoons, which serve as floating foundations for the houses, extend to the mainland. The pipeline therefore had to be flexible enough to accommodate water-level differences of up to 8 m.

A 10 m-wide section in the lakeshore area had to be crossed using horizontal directional drilling.
Troubleshooting
FRANK GmbH was able to provide an economically and technically viable solution to all these challenges with the AGRU “Poly-Flo” double-wall pipe system, made from the thermoplastic material PE 100-RC. The Poly-Flo pipe system is characterised by a double-wall pipe extruded as a single strand, providing a high level of system security. Possible leaks in the inner pipe can be detected in the annulus by the leak detection system installed there. The outer pipe contains the conveyed medium, preventing it from entering the lake. A positive-pressure leak detection system was chosen to monitor the double-wall pipe system. In this process, both walls of the double-wall system are monitored for leaks. The monitoring pressure is higher during operation than any other internal or external wall pressure, so a drop in pressure indicates a leak.
A constant monitoring pressure of 1.5 bar is maintained in the annulus of the Poly-Flo pipe system. The pipes and fittings of this highly compact double-wall system are manufactured in a single production process, either by extrusion (pipes) or moulding (fittings). Continuously extruded webs make it easy to align the inner and outer pipes. One advantage of the continuously extruded webs is that the pipes can be separated at any point, where required to suit the isometric layout. The significantly smaller component dimensions allow for easy installation, even in confined spaces. The individual double-wall pipe components were joined by simultaneous welding. As this process welds the inner and outer pipes at the same time in a single step, it was the optimal solution from both an economic and a processing perspective. Double-wall pipe made from PE 100-RC is highly flexible, allowing it to accommodate the considerable height difference between the transition point on the mainland and the pontoons without additional fittings.

AGRU Kunststofftechnik extrudes the Poly-Flo double-wall wastewater pressure pipe as a single strand.
Why PE 100-RC?
PE 100-RC was selected for the pipe material. The innovative PE 100-RC material, which is resistant to cracking, offers much greater resistance to slow crack growth than PE 100. Thanks to this increased resistance to stress cracking, pipe systems made from PE 100-RC can also be installed without a sand bed. In addition to its resistance to corrosion from the surrounding water, PE 100-RC’s ability to withstand the changing temperatures in Brombachsee was an advantage over other materials. As the wastewater may also contain larger solid particles, PE 100-RC’s excellent abrasion resistance was another key factor in the material choice.

The highest safety standards apply to wastewater disposal in a catchment area. AGRU’s Poly-Flo pipeline is equipped with a leak detection system in the annulus.
Implementation
The pipes serving as connection sewers between the individual houses are made from Poly-Flo PE 100-RC OD 90/63 pipes manufactured by AGRU Kunststofftechnik. Once assembled, the collected wastewater from all the floating houses is pumped to the main pipe. The main pipe, made from Poly-Flo PE 100-RC 160/110 pipe, and the connection pipes were welded directly on site. A 10 m-wide public footpath lies between the lake and the wastewater reservoir on the mainland, so it was necessary to bore beneath it. The so-called horizontal directional drilling method (HDD) was used. To allow the pipe section to sink slowly to the bottom of the lake, it had to be made heavier. This was achieved by filling the pipe with water and fitting additional pipe clamps embedded in reinforced concrete. The project was completed within the planned timeframe. The “Floating Houses” have been very popular with tourists since shortly after completion, offering comfortable accommodation on the beautiful Brombachsee.
Question about this story? Ask your question
Who worked on it
Drijvende Huizen
- Poly-Flo pipesAGRU Kunststofftechnik
Keep following this
Get an email when a new story is published. No account needed.
- ProjectDrijvende Huizen
- SubjectSpecials
- CompanyAGRU Kunststofftechnik