Multidisciplinary project

The major maintenance works at Roode Vaart lock in Moerdijk are a perfect fit for Van der Straaten Aannemingsmaatschappij. “We can make full use of our technical knowledge and expertise on multidisciplinary contracts like these,” says head of delivery Richard Goetheer.
“Waterschap Brabantse Delta set out only the functional requirements in the contract, with the aim of extending the structure’s service life by 30 years. It is up to us to determine how to achieve this.
The work ranges from concrete repairs and installing handrails and fencing to replacing the fendering and inspecting and renovating the lock gates. Ultimately, we must renovate and modify the lock so that CE marking can once again be issued for the structure.”
According to Goetheer, the tight schedule is by far the biggest challenge for Van der Straaten. “It was particularly important to reinstall the lift gate before the storm season began (1 October). We had just six weeks to renovate it. We carried out a visual inspection and 3D scan of the sector gates. These will be renovated at a later stage. The great thing is that virtually all the work involved was engineered in-house and carried out by our own people. That makes it especially satisfying.”
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- ProjectRoode Vaart