Van Ooijen Gouda’s rail infrastructure division is a familiar sight alongside the railway. “We are among the leading companies in platform construction in the Netherlands,” says managing director Harmen Eijkelenboom, with justifiable pride.
“We take a fully turnkey approach to station renovation, with minimal disruption and maximum effectiveness. And we do so throughout the Netherlands, from Leeuwarden to Eijsden (South Limburg) and from Bad Nieuweschans to Vlissingen.

Van Ooijen Gouda has been in business for seventy years and operates in two sectors: rail infrastructure and asphalt-related road construction, including paving, drainage and foundations. “The rail infrastructure division focuses on all civil engineering works alongside the railway. In many cases, this work is connected with platforms, but we also build and maintain inspection paths, install fencing and construct bicycle shelters in station forecourts,” explains Eijkelenboom. “Our work is mainly on ProRail land (Heavy Rail), but in recent years we have also been increasingly active for Light Rail clients. Recently, for example, we renovated 23 stops on the SUNIJ light rail line on behalf of the province of Utrecht. In eight weeks, we demolished and rebuilt 46 platforms non-stop (16 hours a day).”

A fantastic team of people
According to Eijkelenboom, why is Van Ooijen Gouda among the leading companies in platform construction in the Netherlands? “As well as our technical expertise, we have three key strengths. First, we understand logistics. A rail infrastructure project requires careful logistical planning. So much has to be done in a short time. We cannot afford to have our people on site short of materials or equipment. Secondly, we are fortunate to have a fantastic team of people who are willing to work at night and at weekends. Our work takes place almost exclusively when trains are not running. The third area in which we excel is adhering to the high and strict safety requirements for working alongside the railway. These three factors help us to renew an entire platform in a very short time, sometimes during a weekend possession lasting just 52 hours. That is a major undertaking. But thanks to extremely thorough preparation, a relatively small team can get a huge amount of work done.”

Multi-day possessions
As well as during weekend possessions, Van Ooijen Gouda regularly contributes to even larger projects that require a 9-day possession. “We work non-stop, 24 hours a day, throughout that period,” says Willem Meulman, senior rail infrastructure project manager at Van Ooijen. “Rebuilding a platform usually involves much more than just replacing the paving slabs and retaining walls. The equipment, lighting, public address system and fencing are often replaced too. It is quite a major operation. In 2019, for example, during a nine-day possession, we completely dismantled and rebuilt four stations on the Gouda–Alphen aan den Rijn railway line, with the added challenge at Waddinxveen Noord station of replacing all the foundation piles.
At the end of this year, we will carry out a similar operation at Veenendaal, Veenendaal West and Rhenen stations. As well as preparing and carrying out the work, we also handle the design in-house. This gives us an advantage during preparation, ensuring that everything is properly arranged and the work runs smoothly.”

Platforms to Standard
Since the middle of last year, ProRail has contracted out platform renewals under a single framework agreement to four contractors, under the name Perrons op Norm. This contract covers the upgrading of various stations to the required standard, so that people with reduced mobility can use the train independently. Previously, this work was awarded through separate tenders. Van Ooijen Gouda is one of the four contractors. An important element of the tender was an incentive to use sustainable concrete wherever possible. ProRail uses the Environmental Cost Indicator (MKI) to measure and monitor progress towards this ambition. The aim is to reduce environmental costs by four per cent a year, as agreed in the concrete agreement. “We are going a step further and have partnered with Bosch Beton, the market leader in precast retaining walls and renowned for its highly sustainable production process,” says Eijkelenboom. “Bosch Beton had not previously produced retaining walls for ProRail. Together, we have now developed a highly sustainable product that we are using on new projects. We also use circular concrete paving slabs made from 76% recycled slabs.”

A large proportion of Van Ooijen Gouda’s work involves platform renewals. “That is an area in which we are highly experienced, but we are also regularly brought in for smaller projects, such as replacing guard rails or equipment, extending a platform or modifying a bicycle shelter on ProRail land. In addition, over the past four years we have installed many tens of kilometres of fencing under the framework specification for suicide prevention programmes, renewed inspection paths and asphalted level crossings. We also install noise barriers and culverts beneath the railway. In short, we carry out a very wide range of work. We do not carry out work on the track or overhead lines ourselves, although this is sometimes part of our contract and we subcontract it. We take overall responsibility, focusing on minimal disruption and maximum effectiveness,” concludes Eijkelenboom.
Question about this story? Ask your question
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- SubjectRoad construction
- CompanyBosch Beton