Flexible support structures for two civil engineering structures
Text Roel van Gils Beeld Matemco

On the southern section of the A27 Houten: Hooipolder project, between Everdingen and Hooipolder, not only is 40 kilometres of motorway being upgraded, but more than 50 civil engineering structures are also being modified, widened or completely replaced. Two new underpasses are being built around the Hooipolder interchange. Partly because of the specific shape of the deck, the ALSÉÉN construction consortium used Matemco’s advanced Kwiksteigersysteem. And thanks to the 75 kN forkhead system’s high allowable leg loads, less support equipment was needed, which also meant less labour.
Ballast Nedam, which forms the ALSÉÉN construction consortium together with Fluor Infrastructure, is familiar with Matemco’s systems. “We were asked to engineer and supply the support structure for both decks,” says Tom Diepgrond, technical adviser at Matemco. “The main challenge, particularly for the underpass on the A27, was the ‘kinked’ deck. We had to follow that shape with our support structure. Our Kwiksteigersysteem is ideally suited to these kinds of challenging shapes, thanks to its flexible beam and leg lengths, as well as its high allowable leg loads. This gives us a great deal of flexibility when designing the structure, which we always engineer and develop in 3D.”

75 kN forkhead system
For the underpass on the A27, Matemco supplied a total of 1,000 m2 of support equipment of the Kwiksteiger 75 kN forkhead system type. “We positioned the legs so that we could follow the kink line accurately,” Diepgrond explains. “One of our regular labour partners, Madema Steigerwerken, carried out the assembly up to the horizontal formwork. The construction consortium then installed all the remaining formwork, the steel fixers got to work and the concrete was poured. Once it had cured, everything was dismantled, and some of our support equipment was reused and reconfigured for the deck of the underpass on the Oosterhoutseweg, which is now under construction and will be slid into place later this year. A total of 275 m2 of support will be used for a deck with the same thickness of 700 mm.”
The Kwiksteigersysteem is widely used in civil engineering concrete construction. It is suitable for heavier loads, and its unique tilting plates and base plates mean that slopes and angles, both in the deck and at ground level, are no problem. The support system is also compatible with the Kwiksteiger scaffolding system of the same name, making it possible to create a safe elevated working platform within the structure if required. “The A27 project will continue for a few more years, so we hope to be involved again in a future phase,” Diepgrond concludes.
Een zakelijke vraag aan Ballast Nedam Road Specialties? Get in touch
Who worked on it
A27 Houten – Hooipolder
- support structureMatemco
- installationMadema Steigerwerken
Keep following this
Get an email when a new story is published. No account needed.
- ProjectA27 Houten – Hooipolder
- SubjectRoad construction
- CompanyMatemco
- CompanyMadema Steigerwerken
- CompanyBallast Nedam Road Specialties