Platform on civil engineering, underground infrastructure, energy, construction equipment & construction machinery
Save the date: September 15, 2022

Save the date: Sept. 15, 2022

Van den Heuvel is active on various levels to reduce or eliminate nitrogen and CO2 emissions on the construction site. The electrification of machines is an important point of attention in this regard. We have made great strides in this area. The result? The first electrically powered Sennebogen crawler boom crane.

An important development that we are pleased to announce at the Zero emission event at Thursday, Sept. 15, 2022. You are welcome to tour the Sennebogen crane. There will also be a number of sustainable machines and a networking reception. 

Please put the date in your calendar and register for the Zero emission event below!

Sign up

Gerelateerde artikelen

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Send us a message

Kunnen we je helpen met zoeken?

Bekijk alle resultaten