Platform on civil engineering, underground infrastructure, energy, construction equipment & construction machinery

Iv-Infra

Historic lock complex gets major upgrade 7

Historic lock complex gets major upgrade

Rapid assessment of large numbers of non-water retaining objects on flood defenses 8

Rapid assessment of large numbers of non-water retaining objects on flood defenses

Towards a future-proof and sustainable railroad with circular superstructure renewal 9

Towards a future-proof and sustainable railroad with circular superstructure renovation

Conservation study of a bridge of which little is known 10

Conservation study of a bridge for which little is known

Integral fitting design 11

Integral fitting design

The design of the new Dock Bridge in Flushing 12

The design of the new Dock Bridge in Flushing

Search, find and connect with companies in your industry!

Find them in our company index

 
To business index
The unusual design of the new Prince Claus Bridge in Dordrecht 13

The unusual design of the new Prince Claus Bridge in Dordrecht

How hard can it be? 14

How hard can it be?

Bascule bridges over the New Lock Terneuzen 15

Bascule bridges over the New Lock Terneuzen

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Send us a message

Kunnen we je helpen met zoeken?

Bekijk alle resultaten