
Wherever there are construction plans, the same questions arise. What does the subsurface look like? Are there cables and pipes on the construction site? Does the underlying soil type offer sufficient bearing capacity?

As a consulting and engineering firm, Boorsma performs assignments within the broad spectrum of construction, infrastructure, hydraulic engineering and soil.

On behalf of the province of Drenthe, Van Spijker Infrabouw B.V. is reconstructing the Emmen-West interchange. This is part of the doubling of the N34 between Coevorden and Emmen and the junction at Emmen-West with the Rondweg Emmen (N391).
Find them in our company index
To business index