
And the importance of comprehensive insight into the state of our infrastructure. The Netherlands is facing an enormous renovation and replacement task. Our roads, bridges, and locks were largely built in the 1960s and 1970s and are approaching the end of their technical lifespan. With more than 40,000 bridges, 137 locks, and thousands of kilometers […]

In 2024, nearly 50,000 digging damage incidents were reported in the Netherlands, up from 2023 (source: RDI). In 60 percent of cases, the cause was the failure to locate cables and pipes or to locate them adequately. Excavation damage thus remains a persistent problem. TerraCarta helps prevent damage by accurately locating cables and pipes. Excavation damage prevention [...]

For the widening of the A10 motorway at the De Nieuwe Meer junction, the TriAX construction consortium faced a complex challenge: building on a postage stamp, with little space and even less time. Traditional solutions, such as preloading with sand, were simply not possible. That is why it was decided to base the expansion of the A10 South on a […]



Find them in our company index
To business index