Platform on civil engineering, underground infrastructure, energy, construction equipment & construction machinery

Underground infra

Urgent approach to tunnel technical installations rail tunnels Betuweroute 4

Urgent approach to tunnel technical installations rail tunnels Betuweroute

Air ventilation and fire safety in tunnels starts with a good ventilation system 5

Air ventilation and fire safety in tunnels starts with a good ventilation system

Distinguished in complex foundation work 6

Distinguished in complex foundation work

Portfolio approach in nine years to future-proof five South Holland state tunnels 7

Portfolio approach in nine years to future-proof five South Holland state tunnels

Sixteen zinc joint surrounds for Oosterweel tunnel from Oude-Tonge 8

Sixteen zinc joint surrounds for Oosterweeltunnel from Oude-Tonge

Capacity of 10,000 m3 per hour wastewater temporarily diverted 9

Capacity of 10,000 m3 per hour wastewater temporarily diverted

Search, find and connect with companies in your industry!

Find them in our company index

 
To business index
On experience we build the future 10

On experience we build the future

Major sewer system repair in Tilburg-North 11

Major sewer system repair in Tilburg-North

Works Schijnkoker Merksem completely completed 12

Works Schijnkoker Merksem completely completed 

Bekijk meer artikelen

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Send us a message

Kunnen we je helpen met zoeken?

Bekijk alle resultaten