
And the importance of comprehensive insight into the state of our infrastructure. The Netherlands is facing an enormous renovation and replacement task. Our roads, bridges, and locks were largely built in the 1960s and 1970s and are approaching the end of their technical lifespan. With more than 40,000 bridges, 137 locks, and thousands of kilometers […]

This week, WarmtelinQ is using a guided drilling technique to lay a long heat transport pipeline under the Nieuwe Maas river. The pipeline will run under the river from Vondelingenplaat to Vlaardingen. It is more than a kilometer long, measuring 1,039 meters in total. This is one of the longest drillings carried out by WarmtelinQ. The pipeline is […]

In 2024, nearly 50,000 digging damage incidents were reported in the Netherlands, up from 2023 (source: RDI). In 60 percent of cases, the cause was the failure to locate cables and pipes or to locate them adequately. Excavation damage thus remains a persistent problem. TerraCarta helps prevent damage by accurately locating cables and pipes. Excavation damage prevention [...]
Find them in our company index
To business index