Platform on civil engineering, underground infrastructure, energy, construction equipment & construction machinery

New Lock Terneuzen

Complex work with various disciplines at New Lock Terneuzen 7

Complex work with various disciplines at New Lock Terneuzen

Watertightness of New Lock guaranteed thanks to special membrane system 8

Watertightness of New Lock guaranteed thanks to special membrane system

As much as 207,000 meters of vertical drainage for the New Lock in Terneuzen 9

As much as 207,000 meters of vertical drainage for the New Lock in Terneuzen

Craftsmanship ensures smooth opening and closing of bridges 10

Craftsmanship ensures smooth opening and closing of bridges

Demerara Greenheart Lumber for New Lock 11

Demerara Greenheart Lumber for the New Lock

Plastic fire main for New Lock in Terneuzen 12

Plastic fire main for New Lock in Terneuzen

Search, find and connect with companies in your industry!

Find them in our company index

 
To business index
Processing 350,000 cubic meters of concrete for the New Lock in Terneuzen 13

Processing 350,000 cubic meters of concrete for the New Lock in Terneuzen

Work on the New Lock in Terneuzen is progressing steadily 14

Work on New Lock in Terneuzen progressing steadily

The best seals come from Ridderkerk 15

The best seals come from Ridderkerk

Bekijk meer artikelen

"*" indicates required fields

Send us a message

This field is for validation purposes and should be left unchanged.

Kunnen we je helpen met zoeken?

Bekijk alle resultaten