The Vernieuwing Verkeerscentrale Amsterdam project team is realizing a new traffic center and a fall-back facility for operating and monitoring the municipal road tunnels and performing traffic management on the urban road network. These are the main tasks of the traffic center.
Silt, gravel and crushed stone. These three materials are supplied or removed in large quantities during the widening of the Julianakanaal canal. The supply and removal goes through Overslagbedrijf Haven Born, which has its own unloading quay at Franciscushaven in Born. "We can load and unload ships up to 5,000 tons on our unloading quay," says Joyce Leenaerts, [...]
Interesting for machines and movable structures Biodegradable lubricants are well established in the earth-moving industry. This makes sense, because the latest generation of saturated esters and PAOs are characterized by exceptional performance and long life. Taco Mets, Technical Director at Van Meeuwen Lubrication, also notices an increasing interest from civil engineering. "Biodegradable [...]
Find them in our company index
To business index