Platform on civil engineering, underground infrastructure, energy, construction equipment & construction machinery

Bonneveld

bonneveld4

At the Lely monument, halfway down the dike, a sheet pile structure was installed with anchoring.

20211220 153715

8,000 m2 of reinforced soil structures

Search, find and connect with companies in your industry!

Find them in our company index

 
To business index

"*" indicates required fields

Send us a message

This field is for validation purposes and should be left unchanged.

Kunnen we je helpen met zoeken?

Bekijk alle resultaten