Building New Ways
Successfully realizing complex construction projects with a positive impact on our society is what drives us. Projects that are essential to our health, prosperity and economy - from strengthening the port of Rotterdam to protecting the Netherlands from flooding and developing sustainable energy supplies.
Our world is changing, placing ever greater demands on infrastructure and construction projects. This leads to broader project scopes and greater risk profiles. The market demands innovative collaborations in which technically unprecedented opportunities arise, but also organizational challenges. In this, Count & Cooper brings the necessary connection - between people, disciplines and companies. We believe in a risk-based partnership, where our success is directly linked to the project success.
We make mega projects manageable
Completing large-scale construction projects on time and on budget is as complex as keeping a Swiss watch running. Every part must fit together perfectly. Count & Cooper is that connecting factor.
We specialize in Integrated Project Delivery (IPD), an approach that optimizes collaboration and minimizes failure costs. Through advanced digital technology and 5D methodologies (combining 3D images with time and cost), we maintain control over progress and achieve optimal project management. As a management partner, we assume integrality and control without physically building ourselves. We provide multidisciplinary teams that function within consortia as the smallest but most impactful player.
Impactful projects
Change & innovation in the construction industry are essential. There are increasing demands on price, quality and cost. Those who want to continue to develop must dare to change; break new ground. Together with our partners, Count & Cooper takes responsibility: we make new opportunities & developments possible. We drive change, change that really moves the construction world forward. This working method and philosophy is reflected in our projects. Successful projects start at the drawing board and have no end station. All to build it as efficiently, reliably and profitably as possible.