Characteristic of integrated contracts is that the contractor is responsible for the realization of the work, the method of working and the functioning of its management system. The client's role is mainly limited to formulating the desired result, controlling the contract and risk-controlled checking whether the performance requirements are met.
Thanks to the System-oriented Contract Management in Infrastructure course you gain control over integrated contracts and mastery through collaboration and clear division of labor. Read more